The Review is a working session with stakeholders, not a status presentation — and its real output is a changed Product Backlog.

The Sprint Review happens near the end of the Sprint. The Scrum Guide describes its
purpose as inspecting the outcome of the Sprint and determining future adaptations — and
it is explicit that the event is a working session, not a presentation.

“Not a presentation” is the part teams get wrong. A Review where someone walks through slides while stakeholders watch has inspected nothing. If nobody asked a question that changed something, the Review did not happen.

Who is there

The Scrum Team and key stakeholders. That second half is what makes it work.
The people who will use the result look at the result, and their reaction is data you
cannot get any other way.

What actually happens

  1. The Developers show the Increment — working, not described.
  2. Progress toward the Product Goal is discussed.
  3. Attendees collaborate on what to do next.
  4. The Product Backlog is adjusted to meet new opportunities.

Step 4 is the output. A Review that ends with the backlog exactly as it started
either delivered nothing surprising, or nobody was listening.

Show, do not tell

Demonstrate the result working. A slide describing a feature and the feature running produce completely different conversations — and only one of them surfaces the thing you got subtly wrong.

What about unfinished work?

Items that did not meet the Definition of Done are not presented as done. They return
to the Product Backlog and are reconsidered — not automatically carried into the next
Sprint, which is how a team accumulates a permanent backlog of nearly-finished work.

Say plainly what was not finished and why. A Review that hides it teaches the
stakeholders to distrust the ones that do not.

In Agile Together

Step 8 lists what was completed inside this Sprint’s window — dated from the Planning, not simply everything on the board — and what is still pending. It hands you a prompt to write a 3-to-5-line executive summary plus any feedback for the Product Backlog, and saves the summary to Scrum Events.

The window matters: without it, work from Sprint 1 would keep counting in Sprint 3, and velocity would be meaningless.

Next

Next: the Retrospective — the event that changes how you work.

Agile Together is a free course. The package — scripts plus a portable Python — is a single download: get the course package. You install nothing.

Project Together

Track your progress through PMBOK 8

Create your free account to save your reading progress, earn points on every quiz, and unlock certificates as you master each domain.

Create Free Account →

Free forever • No credit card required

Facebook
WhatsApp
Twitter
LinkedIn
Pinterest

Leave a Reply